Visit out Actual Project!

Sosi Project
Requirement: Supply and complete turnkey installation of all equipment for the SOSI model VF5 and SI model VF 6-7 automotive welding lines, in compliance with European Standards, to ensure production output and product quality
Number of robot welding stations: 22
Number of welding robots: 48
Number of robots and grippers: 44
Completion time: 5/2024 to 12/2024
Result: Funa has completed on schedule, standards and quality of Vinfast.
Lac Hong Project
Requirement: Design, supply, and complete installation of all equipment for the LH9 manual welding line workshop, in compliance with European standards for workspace layout, occupational safety, and product quality.
Project duration: 02/2025 to 06/2025
Outcome: Funa has completed on schedule, standards and quality of Vinfast.


vf6car chassis project
Project of welding chassis of Model VF6 car at Mechanical factory
Requirement: Design, manufacture, and install a complete CO2 automatic chassis welding line (Sub Frame) for Model VF6.
Number of CO2 welding stations: 20 stations
Number of robots used: 50 robots
Number of experts, engineers, technicians: 50 people
Design capacity: 100,000 vehicles/year
Completion time: 6/2022 to 1/2023
Result: Funa has completed on schedule, standards and quality of Vinfast.
VFE34,vf5-rhd project
Body welding project for Model VFe34-RHD, VF5-RHD at Body Shop
Requirement: Design, manufacture, and install a complete manual welding line for the VF5 right-hand drive model. The line is integrated on the existing VF5 left-hand drive welding line.
Number of robot welding stations: 15 Station
Number of repair welding stations (shared for left hand drive and right-hand drive): 20
Design capacity : 120 vehicles/year
Completion time: 8/2023 to 2/2024
Project purpose: Providing vehicles for export to markets: Indonesia, India,…


cva_qtr project
Scope of work: Layout, 3D design, 2D drawing release, simulation, control programming, machining, transportation, installation
Completion items: Layout, 3D Design, 2D Drawing release, simulation, control programming, machining, transportation, installation.
Number of products : 22 stations
Product type: Geo, Respot, Trolley, Hanger
Completion time: 6/2023 to 10/2023
Number of Robots: 66.
BODY SHOP- INDONESIA